Steel Structure Logistics Park Warehouse

Project Overview Project Name: Steel Structure Warehouse in a Logistics Park. Building Area: 8000㎡ (Length × Width optional: 100m×80m / 160m×50m, etc.). Structural Form: Portal Frame Light Steel Structure (Single/Double Span, Span Recommended 24-36m). Eaves Height: 8-12m (Meeting the requirements of shelf stacking and forklift operation). Roof/Wall: Double-layer corrugated steel plate + insulation cotton (or polyurethane sandwich panel). Design Standard: "Steel Structure Design Standard" GB 50017 "Gate Frame Light House Steel Structure Technical Specification" GB 51022.

MOQ: 1000 square meters
  • Fast And Safe Logistics
  • Provide drawings to get a free quote at the touch of a button.

Steel structure logistics park warehouse construction

Fast construction organization

Foundation construction: 15-35 days, provide embedded parts positioning template, accuracy ±2mm.
Steel structure installation: 20-25 days, daily hoisting volume ≥ 4 steel frames, synchronous installation of support system.
Enclosure system: 15-20 days, mechanical fixing with self-tapping screws to eliminate water leakage hazards.
Total construction period: 50-75 days, 30% shorter than traditional construction.

Construction process

1. Design deepening
2. Workshop prefabrication
3. Foundation embedding
4. Rigid frame hoisting
5. Purlin/support installation
6. Roof panel laying
7. Wall panel installation
8. Completion acceptance

Quality assurance measures

Material control: Spectral analysis of the first steel piece, random inspection of insulation cotton with a bulk density of ≥16kg/m³
Process monitoring:
100% torque test of high-strength bolts
Roof water spray test (lasting 2h)
Acceptance criteria:
Verticality of the frame ≤H/1000 and ≤25mm
Roof flatness ≤5mm/2m

Purun Steel Structure Service Commitment

Compensation for construction delay: 0.5‰/day of contract value will be paid for overdue period
Warranty period: 50-70 years for main structure, 10 years for enclosure system
24h emergency response: provide maintenance tracking service